| | ESI provided design and construction services for several projects on the UM Main Campus, including a 12,000 SF retaining wall on the historic Hilgard Cut; Phase 2 upgrades to the wastewater treatment plant (influent pump station); Old Taylor Road Parking lot (200 spaces); campus water system hydraulic analysis; campus master plan mapping and utility assessments. Total cost of the active projects is approximately $1.2 million. |  | 